Physical Address: | 2681 George Smith Rd (South of Daisy) Claxton, GA 30417 |
Mailing Address: | 3 Freeman St Claxton, GA 30417 |
Phone: | (912) 334-2413 |
Hours: | 8:00 am - 4:00 pm (M-F) 8:00 am - 3:00 pm (Sat) |
Holiday Hours: Hours may vary week to week. Check the Landfill FB page for current information: https://www.facebook.com/EvansCountyLandfill/ or the Evans County FB page: https://www.facebook.com/EvansCountyGA/ | Closed on Sundays |
What Can Be Dumped?
The following items can be dumped at the Evans County Landfill:
- Construction & Demolition: Buckets, lumber, cabinets, doors, drywall, fence, bale wraps, windows, pipe, conduit, PVC, parts, ceiling fans, pool liners, tarps, concrete, bricks, carpet, padding, or roofing
- Scrap Metal: Metals, steel, or aluminum.
- Tires
- Brown Goods: Bulk, non-liquid, MSW items. Examples include TV’s, computers, plastic play sets, mattresses, etc.
- White Goods: Washers, dryers, stoves, or dishwashers
- Yard Trimmings: Grass, pine straw, limbs, plant containers, pots, or shrubbery
- MSW (Residential Waste): Household garbage (bagged)
If in doubt about an item, please call (912) 334-2413.
Directions From 301 South
Turn East on Green Cypress Church Road. Turn right on David Tippins Road. Turn right at dead-end onto George Smith Road. Landfill will be on the right.
Directions From Hwy 280
Turn South onto Old Hwy 250 at the caution light in Daisy. Take left on Sunbury Road. Turn right on David Tippins Road. Turn right at dead end onto George Smith Road. Landfill will be on the right.
Contract Pricing
As of December 1st, 2016, in order to utilize contract pricing, vendors must submit an application and complete all necessary paperwork in order to create an account with Evans County (Download necessary paperwork here).
Construction & Demolition Rates | |
0-100 Tons (Monthly) | $30 / Ton |
101-500 Tons (Monthly) | $25 / Ton |
501+ Tons (Monthly) | $20 / Ton |
Construction & Demolition Rates (Shredded) | |
0-100 Tons (Monthly) | $28 / Ton |
101-500 Tons (Monthly) | $23 / Ton |
501+ Tons (Monthly) | $18 / Ton |
Scrap Metal | |
Scrap Metal | No Charge |
Tires | |
Tires | $115 / Ton (approx. $1.50 per passenger tire) |
Brown Goods | |
Brown Goods | $55 / Ton |
White Goods | |
White Goods | No Charge |
Yard Trimmings | |
Yard Trimmings | $35 / Ton |
Non-Contract Pricing
Construction & Demolition Rates | |
Construction & Demolition | $30 / Ton |
Scrap Metal | |
Scrap Metal | No Charge |
Tires | |
Tires | $115 / Ton (approx. $1.50 per passenger tire) |
Brown Goods | |
Brown Goods | $55 / Ton |
White Goods | |
White Goods | No Charge |
Yard Trimmings | |
Yard Trimmings | $35 / Ton |
MSW (Residential Waste) | |
MSW (Residential Waste) | $42 per ton/ $1.50 per bag for up to 6 bags |